Browse
  • AppendixB
    Recommended Permit Fee Schedule

    (This appendix is informative and is not part of the code.)

    B101
    MECHANICAL WORK, OTHER THAN GAS PIPING SYSTEMS

    B101.1Initial Fee

    For issuing each permit $___

    B101.2Additional Fees

    B101.2.1

    Fee for inspecting heating, ventilating, ductwork, air-conditioning, exhaust, venting, combustion air, pressure vessel, solar, fuel oil and refrigeration systems and appliance installations shall be $___ for the first $1,000.00, or fraction thereof, of valuation of the installation plus $___ for each additional $1,000.00 or fraction thereof.

    B101.2.2

    Fee for inspecting repairs, alterations and additions to an existing system shall be $___ plus $___ for each $1,000.00 or fraction thereof.

    B101.2.3

    Fee for inspecting boilers (based upon Btu input):

    33,000 Btu (1 bhp) to 165,000 (5 bhp)$___
    165,001 Btu (5 bhp) to 330,000 (10 bhp)$___
    330,001 Btu (10 bhp) to 1,165,000 (52 bhp)$___
    1,165,001 Btu (52 bhp) to 3,300,000 (98 bhp)$___
    Over 3,300,000 Btu (98 bhp)$___

    For SI:1 British thermal unit = 0.2931 W, 1 bhp = 33,475 Btu/hr