Browse
  • APPENDIXA
    PLUMBING PERMIT FEE SCHEDULE

    The provisions contained in this appendix are not mandatory unless specifically referenced in the adopting ordinance.

    Permit Issuance
    1.For issuing each permit$___
    2.For issuing each supplemental permit____
    Unit Fee Schedule
    1.For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping and backflow protection thereof)____
    2.For each building sewer and each trailer park sewer____
    3.Rainwater systems—per drain (inside building)____
    4.For each cesspool (where permitted)____
    5.For each private sewage disposal system____
    6.For each water heater and/or vent____
    7.For each industrial waste pretreatment interceptor including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps____
    8.For installation, alteration or repair of water-piping and/or water-treating equipment, each____
    9.For repair or alteration of drainage or vent piping, each fixture____
    10.For each lawn sprinkler system on any one meter including backflow protection devices therefor____
    11.For atmospheric-type vacuum breakers not included in Item 2:
    1 to 5____
    over 5, each____
    12.For each backflow protective device other than atmospheric-type vacuum breakers:
    2 inches (51 mm) and smaller____
    Over 2 inches (51 mm)____
    Other Inspections and Fees
    1.Inspections outside of normal business hours (minimum charge 2 hours)___ per hour
    2.Reinspection fee assessed under provisions of Section 107.4.3___ each
    3.Inspections for which no fee is specifically indicated (minimum charge one-half hour)___ per hour
    4.Additional plan review required by changes, additions or revisions to approved plans (minimum charge one-half hour)___ per hour